Consultancy services for preparation of DPR for Construction of Bridge over River Chuli, Rynkua, East Khasi Hills, Meghalaya at Indo Bangla Border Roads near BOP Makumchera, ID 81 (A) in replacement of existing damaged pipe culvert cum causeway.
Client: Executive Engineer, Border Fencing Division-V, CPWD, Tura, Meghalaya
Design consultancy for construction of 5 No’s Bridges as given hereunder;
- 80 m span single lane(1X50+1X30) motor able bridge over Triyath nallah at Bagla,
- 80 m span single lane(1X60+1X20) motor able bridge over Triyath Nallah at Tichka,
- 60 m span single span motor able bridge over Triyath nallah at Lyal,
- 80 m span single lane(1X50+1X30) motor able bridge over Solki nallah at Solk
- 50 m span (1X46) km 1st RD 125-175 Domel to Rajpur Top via Thal mohra Road
Work included design of Earthworks, RCC Abutments, Piers, Dirt wall, Bridge Superstructure, RCC deck slab, Approach slab & approach Road amounting and cost of whole civil works was Rs. 11,97,00,000 (Rupees eleven crore and ninety lacs only). Works also included detailed topographic survey, cast in situ and laboratory testing of subgrade material of approaches to bridges, detailed hydraulic calculations, detail engineering design of approach road and bridge works including rate analysis of road and bridge works, computation of quantities (BOQ) and preparation of As built up drawings.
Client: SGF Infra Pvt. Ltd for PWD(R&B), Jammu (J&K)
Design consultancy for Bridges in PMGSY circle, Batote allotted as a single contract vide Chief Engineer PMGSY (JKRRDA) Jammu Allotment No. CEJ/PMGSY/8739-49 dt. 10/09/2011 amounting to Rupees Ten Crores Four lacs and Eight Thousand only (Rs. 10,04,08,000/-) as cost of civil works. Details of designed bridges are as follows;
- 35m span bridge on Hewgan Bhordhor RD KM 6th (steel bridge) JK04-29 Banihal Rs. 129.91
- 25m span bridge in KM 8th of Chatroo to Singhpura (steel bridge) JK04-35 Chatroo Rs. 92.79
- 45m span bridge in KM 5th of Chatroo to Singhpura (steel bridge) JK04-35 Chatroo Rs. 167.04
- 45m span bridge Guzzar to Gurinalah (steel bridge) JK04-77 Chatroo Rs. 148.47
- 23m span bridge on Bhrangran to Rote KM 4yh RD 950-75(steel bridge) JK04-36 Doda Rs. 85.37
- 70m span bridge on satringle to Katyara (steel bridge) JK04-63 Doda Rs. 259.83
- 32.5m span bridge in KM 33 Bhagwa to Desa road (steel bridge) JK04-100 Doda Rs. 120.63
Total Rs. 1004.08
Works included detailed topographic survey, cast in situ and laboratory testing of subgrade material of approaches to bridges, detailed hydraulic calculations, detail engineering design of approach road and bridge works including rate analysis of road and bridge works, computation of quantities (BOQ) and preparation of as built up drawings.
Client: SGF Infra Pvt. Ltd.
Design consultancy for 3 number of bridges design in the state of J&K and details of bridges are as follows;
- Construction of 2x20M span Steel Plate girder motorable bridge at Hemis Nallah, class-A loading and 4.25m clear carriageway under Executive Engineer, Construction Division PWD, Leh
- Construction of 60M span Nonial-Manpur bridge at Nowshera including construction of approach roads(CRFl, class-A loading and 4.25m clear carriageway under Executive Engineer PWD(R&B) Division, Nowshera
- Construction of 15m (Revised 35M) span Bridge through type motorable bridge in km 21st RD 0/350 of khari-sarbagni {Higni Railway road to shagan), Package No. JKO4-136, Phase-Vttt, Block Ramsoo under Executive Engineer PMGSY, Division Banihal
Works included detailed topographic survey, cast in situ and laboratory testing of subgrade material of approaches to bridges, detailed hydraulic calculations, detail engineering design of approach road and bridge works including rate analysis of road and bridge works, computation of quantities (BOQ) and preparation of as built up drawings.
Client: SGF Infra Pvt. Ltd
Drain Design under Service Road of RRTS Stations in Package-3 Lot 2 (Partapur, Rithani and Shatabdi Nagar)
Client: National Capital Region Transport Corporation (NCRTC)
Design of 672 m long PSC box girder having span arrangement of 2*34.16 + 13*46.36 for rehabilitation and up-gradation to 4-laning of Rajamunda-Barkote Section of NH-23 (New NH No. 143) (Km. 287.200 to Km. 337.185) in the State of Odisha under NHDP-IV. Works include all topographical survey, hydraulic calculations, detail design and drawings, preparation of BOQ and as built up drawings.
Client: Gayatri Projects Limited
Designing "65Mtr. Span (Upstream) and 80m Span (downstream) Pre-stressed double lane concrete Motorable Bridge with 1.2 M wide Foot Path on Both Sides Over Mendhari Nallah including approaches, cross drainage & protection work on Upstream/ downstream on Mendhar town (District Poonch). Works include all hydraulic calculations, detail design and drawings, preparation of BOQ and as built up drawings.
Client: SGF Infra Pvt. Ltd. for PWD
Design consultancy for Construction dOf 1x25M span bridge at Km 165.296, Km174.425 and Km 185.509 including its approach on NH-301 Kargil - Zanskar road in the state of J&K on EPC mode under package PMDP
Client: SGF Infra Pvt. Ltd. for PWD, MORTH