Completed Design Projects

Completed Design Projects

  • Providing Consultancy services of 03 flyover and 02 underpass from Village Ghata to Vatika Chowk (approx. 7 km) of SPR from existing for 04 lane to 06 lane and DPR of AIT Chowk at Golf Course Road with SPR with provision of 01 underpass and 01 rotary junction and 02-03 lane carriageway
    Client: Gurugram Metropolitan Development Authority (GMDA)

  • Design Consultancy services for all road and structure works design for 134.96 km containing four packages on HAM basis in the state of Maharashtra.
    Client : R.K. Chavan Infrastructure Pvt. Ltd. For PWD Maharashtra

  • Design Consultancy services for all road and structure works design for 134.96 km containing four packages on HAM basis in the state of Maharashtra. (Project transferred from R K Chavan Infrastructure Pvt. Ltd. to Welspun Enterprises Limited, on 06-March- 2020)
    Client: Welspun Enterprises Limited, For PWD Maharashtra

  • Design Consultant for balance work for Project of Rehabilitation and Up-gradation of "section -1, Aurangabad – Sillod "from Km 0+000 to 60+630 (Design Chainage) of Aurangabad - Jalgaon Road NH-753F to Four Lane with Paved Shoulder Configuration in the State of Maharashtra"
    Client: R.K. Chavan Infrastructure Pvt. Ltd. for PWD Maharashtra, funded by MoRTH

  • Road Design Consultancy Service for access route. Project-AIT chowk to Group Housing Project in sector-63, Gurugram, Haryana
    Client : DLF Home Developers Limited

  • Providing Consultancy Services for all road works and structure works for construction and Upgradation of existing road to 2-lane with paved shoulder from Km 399.000 to Km. 430.000 of Karanpyarag to Chamoli (Excluding Km 420.250 to Km 420.500 and Km 423.300 to km 423.650) of NH-07 under Chardham Parivoina on EPC basis in the state of Uttarakhand. (Design Length - 28.80 Km).
    Client : Shivalaya Construction Co. Pvt. Ltd. For NHIDCL

  • Consultancy services for complete design of road alignment, plan & profile and provide typical cross section, plan & profile of road alignment, cross sections at regular intervals and details of various parameters for construction of Two-Lane Road on NH Specifications from Paletwa to India-Myanmar Border (Zorinpui) from km 0.00 to km 60.7 in Chin State of Myanmar on EPC mode”
    Client : C & C Constructions Ltd. For Ministry of External Affairs

  • Detailed Design of 6 laning of 64 km of Varanasi- Aurangabad section of NH-2 on DBFOT basis. Services contains producing the GFC's and taking its approval from our immediate
    Client : SOMA Enterprises. (PPP basis)

  • Consultancy Services for feasibility cum DPR for strengthening and up-gradation of 06 lanes Arterial Southern Peripheral Road (SPR), Gurugram, Haryana
    Client : Gurugram Metropolitan Development Authority (GMDA)

  • Design Consultancy Services for all road works and structure design for Two Lane With paved shoulder project Highway comprises the section Pandharpur - Sangola connecting NH-166 Section from Kurudwadi – Padharpur - Singola (SH-210) connecting NH-166 from existing KM 48+375 (Pandharpur) to KM 79+533 (Sangola, NH166) Padharpur (3.200 KM overlay) NH-965C to Two lane with paved shoulder in the state of Maharashtra on EPC basis.
    Client : R.K. Chavan Infrastructure Pvt. Ltd. For MSRDC

  • Development of two lanning of existing Tanakpur to Pithoragarh Road on EPC basis starting from design Km. 91.930 to Km. 120.045 (Design length 28.115 Km) (Survey Km. 92.880 Km. 121.550, length 28.670 Km) of NH-125 (New NH-9) in the state of Uttarakhand.
    Client : Shivalaya Construction Pvt. Ltd. For MORTH

  • Consultancy including Detail Design, value Engineering and all associated scope along with its submission and approval for Construction of ugradation of existing road to 2-lane with paved shoulder, including geometric improvement from Km. 0.00 to Km. 26.706 in Rhenok-Rorathang-Payong of NH-717A on EPC basis under SARDP-NE Phase ‘A’ in the state of Sikkim.
    Client : D.R. Agrawal Infracon Pvt. Ltd for NHIDCL

  • Providing Consultancy services for Structural Design for extension of existing structures (culverts) for Road widening work in Package-3 of Delhi-Ghaziabad-Meerut RRTS Corridor.
    National Capital Region Transport Corporation

  • Consultancy service agreement for "Construction of alternative highway to Gangtok in Sikkim via Bagrakot - Algarah - Rhenok in the State of West Bengal and from Rhenok – Rorathang - Pakyong along with spur from Aritar - Rolep - Menla in the State of Sikkim (Package No. IVB from Km 13.00 to Km 25.60 of Bagrakot - Kafer section of NH 71 on EPC Mode under Phase A of SARDP-NE in the state of West Bengal). The objective of this Contract is the developing a Value Engineering as well as detailed Design Project Report for the above-mentioned project for highways, structures.
    Client: M. G. Contractors Pvt. Ltd for NHIDCL

  • Detailed design services for construction of Two-lane project highway for the road section Rangamati- Tikar-Hazam -Banta-Silli road (MDR-025) from km 8.8 km to km 46.37 km in the state of Jharkhand. Services included design of road and all CD structures of road.
    Client: M. G. Contractors Pvt. Ltd. For Jharkhand state highway authority.

  • Sub consultancy Services for Project Management Phase 1 including Preparation of Detailed Project Report of the Highway (NH No.: 183 A) starting from its junction with NH No.: 183 near Adoor connecting Pathanamthitta, Vadserikkara, Lahai, and terminating at its junction with new NH No.: 183 near Vandiperiyar in the State of Kerala to two / four lane with paved shoulder configuration – Lot V (NH/IAHE/58). Services include all highways, bridge, pavement and all other ancillary work designs.
    Client : STUP Consultants for PWD Kerala

  • Sub consultancy services for Detailed Project Report for 2/ 4 laning of 105 km of roads in state of Andhra Pradesh from Kurnool to Dornala Preparation of Detailed Project Report for Up gradation of Highway starting form junction with NH-40 at Kurnool connecting Nandikotkur, Atmakur and terminating at its junction with NH-765 at Dornala to Two / Four Lane with Paved Shoulder Configuration (Package No: NH/IAHE/30, Category-I).
    Client : Pioneer Infra Consultants Pvt. Limited for NHAI

  • BTES had entered into contracts with WS Atkins (India) Private Limited, as a Sub- Consultant to provide services, for the major project Wiltshire Major Maintenance and had successfully performed and provided services to the Company.
    Client : Atkins (India) Private Limited

  • 4 laning of 44 km or road in state of Assam. Work includes detail design of roads including pavement design, rate analysis, computation of quantities and production of shop drawings. _2016.
    Client : Projects Consulting India (P) Ltd.

  • Consultancy Services for carrying out Rate Analysis of Hiring Charges of Equipment’s.
    Client : KSS Petron Pvt. Ltd.

  • 50 km of hill road design “Tupul” to “Kasomkhullen” in the state of Manipur. _A section under ADB TA for North Eastern State Road Improvement Project “NESRIP”, in year 2008- 2009.
    Client : Transys Consulting Pvt. Ltd

  • Consultancy Services for preparation of Feasibility report for construction of Manarkad bypass on NH-213 in state of Kerala, in year 2010.
    Client : PEMS Engineering Consultants.

  • Highway Design Review of Ranchi – Patratu Dam- Ramgarh Road (package RPR) in state of Jharkhand, in 2010.
    Client : MSV international Inc.

  • Consultancy services for grading the roads (making 3D models) for Bhopal Airport, in year 2010.
    Client : Gifford India Pvt. Ltd.

  • Design review, preparation of BOQ and writing report for 65 km long proposed road connectivity from Bhadrak to Dhamra port in state of Odisha, in year 2010.
    Client : Howe (India) Pvt. Ltd.

  • Computation for road quantities as per the specific requirements of Client for national highways projects in Assam.
    Client : Avanza Engineering Pvt. Ltd.

  • Providing design consultancy services for construction of Intermediate lane road from Yongyah EAC Hq.to 186MW Dikhu Project (length=22km) under EI Scheme in the State of Nagaland.
    Client : A. Pongshi Phom

  • Consultancy services to carry out the feasibility study and preparation of detailed project report for value addition works on four lane Lakhanpur-Vijayapur section from Km 16.35 to Km 80.00 of NH-44 (old NH 1A) in the state of Jammu and Kashmir
    Client : National Highways Authority of India, Jammu, J&K, India

  • Widening and upgradation to 2 lanes with paved shoulder configuration and geometric improvement from Km 8.00 Km 65.000 (Package-1) on Aizawl-Tuipang section of NH-54 in the state of Mizoram with JICA loan assistance.
    Client : Shivalaya Construction Co. Pvt. Ltd.

  • Construction of 2-lane road of Potin to Pangin section of NH-3 from Km 247.05 to Km 284.920 (Package-7) in the state of Arunachal Pradesh under Arunachal Pradesh package of Roads and Highways of SARDP-NE
    Client : Shivalaya Construction Co. Pvt. Ltd. for PWD Arunachal, MORTH

  • Providing Consultancy services for feasibility report and preparation of DPR for strengthening and upgradation of 6-lane in both ways sector dividing road of sector 81A/82A, 81/82, 85/86, 89/90, (NH-8 Ram Pura Chowk to Patudi Road), Asset Id 66, 68, 69, 79, Gurugram.” .
    Client : Gurugram Metropolitan Development Authority (GMDA)

  • Providing Consultancy Services as a Design Consultant for “Improvement / Widening to 2 laning of stretch from Khonsang to Tamenglong of NH-137 in the state of Manipur on EPC mode under SARDP-NE
    Client : Shivalaya Construction Co. Pvt. Ltd. For NHIDCL

  • Consultancy Services as a Design Consultant for "Widening of existing road to 2 lane NH standards along with improvement and realignment from Potin to Pangin via Yachuli, Ziro, Daporizo, Aalong (Package‐5, Design chainage from Km 163.590 to Km 206.660) on NH‐ 13 in Arunachal Pradesh on EPC mode under Arunachal Pradesh package of SARDP‐NE
    Client : Vozrozhdenie India for PWD Arunachal, MORTH

  • Design consultancy for 2 laning of road and bridge works including all the required surveys, investigations and Geotechnical Investigations works for following packages on HAM basis in state of Maharashtra for - Improvement of Roads joining District place
    Client : R.K. Chavan Infrastructure Pvt. Ltd. for PWD Maharashtra

  • Design Consultancy for complete design of road alignment, plan & profile and provide typical cross section, plan & profile of road alignment, cross sections at regular intervals and details of various parameters between Km 60.700 to Km 71+000 for Two Lane Kaladan Road Project, Myanmar.
    Client : Engineering Projects (India) Ltd (A Government of India Enterprise)

  • Design Consultancy for design of all Structures of Two lanes Kaladan Road Project, Myanmar (i.e., Culverts, retaining walls, Breast walls, Bridges, Drains etc.) between KM 60.700 to KM 70.70
    Client : Engineering Projects (India) Ltd (A Government of India Enterprise)

  • Consultancy Services for carrying out feasibility study and detailed project preparation for Redesigning, Rehabilitation and Upgradation to 2-lane/2-lane with paved shoulders or its strengthening in the State of Himachal Pradesh for State Road Sainj (NH-705)-Deha- Chopal-Nerwa-Faduspul Road) [Package Nos. HP/SHIMLA/13]
    Client : PWD Himachal Pradesh, funded by MORTH

  • Construction and upgradation of existing road to 2-lane with paved shoulder of BagrakotKafer section of NH-717A from Km. 3.800 to Km. 13.000 on EPC basis under SARDP-NE Phase ‘Á’ in the State of West Bengal (Package-IV A). Consultancy Services including Detail Design, Value Engineering and all associated scope along with submission and approval.
    Client: M/s. NSPR VKJ – JV

  • Consultancy Services for the project “Construction and upgradation of existing road to 2-lane with paved shoulder of Singtam – Tarku section of NH-510 from Km. 0.000 to Km. 3.500 on EPC basis in the State of Sikkim”
    Client: M/s. NSPR VKJ – JV

  • Consultancy services for Construction and up-gradation of existing road to 2-lane with paved shoulders from existing chainage Km 491.600 to Km 504.371 (Design chainage from Km 473.675 to Km 486.060) of NH-58, (New NH-7) (Vishnuprayag Bridge to Lambagarh) excluding Govindghat-II location (Design Chainage Km 479.925 to Km 480.075 and existing chainage km 498.000 to 498.150) and Govindghat-III location (design Chainage Km 481.788 to Km 481.938 and Existing Chainage Km 499.988 to Km 500.138) in EPC mode under Chardham Program in the State of Uttarakhand.
    Client: Hillways Construction Company Pvt Ltd.

  • Design consultancy for Four Laning of NH-37 (New NH-127) from Nagaon Bypass to Teliagaon (Km 278.600 to km 288.600) in the State of Assam under SARDP-NE Phase- on EPC mode Package-I.
    Client: Ram Parkash Construction (P) Ltd.

  • Detail design for Construction of Four Lane Project Highway comprises the section of National Highway NH-44/Old NH-1A commencing from km 69+780 to km 70+690 (Mansar Morh) i.e.0.91 Km section District Samba in union territory of Jammu and Kashmir
    Client: M/s Azaad Condstructionds

  • Detail design for Rectification of Black Spot - Package 5 from km 67+180 to km 69+030 (Samba) i.e.1.85 Km section in Union Territory of Jammu and Kashmir on EPC Mode (Ministry of Road Transport & Highways)
    Client: Kaluwala Constructions Pvt. Ltd

  • Widening to 2 (Two) Lane with Hard shoulder of Churachandpur to Tuivai section of NH 102B from Km 13.747 to Km 32.835 in the State of Manipur on Engineering, Procurement & Construction (EPC) mode.
    Client: RSM Infra Projects for NHIDCL

  • Providing design consultancy services for Construction and upgradation of existing road to 2lane with Paved shoulder from km. 27+200 (End of Rongli bypass) to km. 37+600 (New Rolep Bridge) of Rhenok – Menla spur (NH-717B) Package-II B on EPC Basis under SARDP-NE Phase ‘A’ in the State of Sikkim.
    Client: M/s A K Builders

  • Providing Consultancy services of 03 flyover and 02 underpass from Village Ghata to Vatika Chowk (approx. 7 km) of SPR from existing for 04 lane to 06 lane and DPR of AIT Chowk at Golf Course Road with SPR with provision of 01 underpass and 01 rotary junction and 02-03 lane carriageway
    Client: Gurugram Metropolitan Development Authority (GMDA)