Safety consultancy for construction of ROB at chainage 146.533 of NH-56 (New NH-731) along with its approaches and associated slip roads in the state of Uttar Pradesh on EPC mode
Client: NHAI
Safety Audit services for Delhi Amritsar Katra (DAK) Expressway Pkg–1,2,3 and 4 of NE5 on HAM MODE (Total Length-120.250 km) in the State of Haryana. Safety Audit for Development, construction and Maintenance phase.
Client: NHAI
Engineering, Procurement, and Construction of Rehabilitation and Upgradation to two-lane configuration of Hamirpur - Karnohal Section (km141.000 to km 181.000) of NH - 70 in the State of Himachal Pradesh under Green National Highways Corridor Project (GNHCP) with the loan assistance of World Bank
Client: MoRTH
Safety Consultants for the following projects in the state of Gujrat:
o Four Laning of Bhavnagar –Talaja Section of NH-8E from KM 7.090 (Design CH. KM 6+945) TO KM 53.585 (Design Ch. Km 54+990) in the state of Gujarat through hybrid Annuity mode under NHDP Phase IV.
o Four laning of Kagavadar–Una section of NH-8E from km 139.915 (Design Ch. Km 140.470) To Km 180.478 (Design Ch. Km 181.450) in the state of Gujarat through hybrid Annuity mode under NHDP Phase IV.
Client: Regional Officer, Gandhinagar, NHAI
Safety consultant for “Four laning of end of Pandoh bypass to Takoli Section of NH-21 from km 221.305 to km 242.000 under NHDP-IVB on Hybrid Annuity Mode in the state of Himachal Pradesh”
Client: Regional Office, NHAI Shimla (H.P)
Safety consultant for “4-laning of UP/Haryana border to Rohna, (Sonipat) section of NH334B from Km. 0.00 to Km. 44.80 (total length 44.80 Km.) in the State of Haryana on HAM Mode (Package-I)”.
Client: Regional Office, NHAI Chandigarh (Haryana)
Safety consultant for “4-laning of Gohana-Sonipat section of NH-352A from Km. 40.601 to KM. 78.837 (total length 38.236 Km.) in the State of Haryana on HAM Mode (Package-II)
Client: Regional Office, NHAI Chandigarh (Haryana)
8-Laning of section of NH-1 (New NH-44) from Mukarba Chowk at Km. 15.500 to Panipat at km. 86. 000 on BOT (Toll) basis in the states of Delhi & Haryana.
Client: Regional Office, NHAI Chandigarh (Haryana)
Construction of Two-Lane with hard shoulders of Chakabama Zunheboto Road on EPC basis from Design Chainage 0.000 Km to 50.000 Km in the state of Nagaland under SARDPNE.
Client: Shivalaya Construction co. Pvt. Ltd
Construction and Up-gradation of existing road to 2 lane with paved shoulder from 491+600 To 504+371 (Designed Chainage from KM. 473+675 To 486+060) of NH-58 (New NH7) (Vishnuprayag Bridge to Lambagarh) Excluding Govindghat-II Landslide location (Designed Chainage KM 479+925 And Existing Chainage KM. 498+000 To 498+150) and Govindghat - III landslide location (Designed Chainage KM. 481+925788 To KM 481+938 and Existing Chainage KM. 499+988 To KM. 500+138) in EPC mode under Chardham Programme in the state of Uttarakhand.
Client: Hillways Construction Company pvt. Ltd.
Services for Safety Consultant for “Engineering, Procurement, and Construction of Rehabilitation and Upgradation to two-lane configuration of Hamirpur - Karnohal Section (km141.000 to km 181.000) of NH - 70 in the State of Himachal Pradesh under Green National Highways Corridor Project (GNHCP) with the loan assistance of World Bank
Client: NHAI/TTL Engineering Pvt. Ltd.
Engagement of Road safety Consultant for:-
a.) Main Deedo Chowk Ambphalla on NH-44 Jammu.
b.) Main Gate of Govt. medical College Bakshi Nagra, Jammu.
Client: PWD Jammu
© Copyright btes.in 2017. All Rights Reserved. | Design by