Completed Survey and Investigation Projects

Completed Survey and Investigation Projects

  • Retro reflectivity testing (both horizontal for lane marking and vertical for road sign boards) from km 0+340 to 9+282 at RCSP package-1 NH-248.
    Client: Oriental Structural Engineers Pvt. Ltd.
  • Topographical survey with LIDAR and deflection testing with falling weight deflectometer, traffic surveys, axle load surveys feasibility cum DPR for strengthening and up-gradation of 06 lanes Arterial Southern Peripheral Road (SPR), Gurugram, Haryana.
    Client: Gurugram Metropolitan Development Authority (GMDA)
  • Traffic Survey and Pavement Condition survey, Borrow Area and Quarry Areas survey for DPR project for the Road Dinga Amb-Chalan-Udhampur (80Km) and LakhanpurMahanpur-Basphli (75Km) in the state of Jammu and Kashmir.
    Client: Rodic Consultants Pvt. Ltd.
  • Topography surveys of 37.5 km long road, traffic surveys including CVC counts and axle load surveys for construction of Two-lane project highway for the road section RangamatiTikar-Hazam-Banta-Silli (MDR-025) from km 8.8 km to km 46.37 km in the state of Jharkhand.
    Client: M. G. Contractors Pvt. Ltd
  • Topographic Surveys of roads around Laxmi Nagar District Centre (Non-Hierarchical commercial Centre/shopping mall), Delhi.
    Client: DIMTS, New Delhi
  • Topographic Surveys of roads around Rhenok- Rorathang- Pakyong of NH-717A from Km 0.00 to Km 26.706 in the state of Sikkim.
    Client: Dineshchandra R. Agrawal Infracon Pvt. Ltd., Ahmedabad
  • Carrying out traffic surveys, Axle load surveys & analyzing OD and preparing trip matrix, at Mohol connecting Pandharpur, Malshiras, Phaltan, Nira, Jejuri, and Saswad near Pune.
    Client: Sugam Technocrats Pvt. Ltd.
  • Carrying out traffic Surveys, Axle load survey & material investigations, laboratory testing of collected material from test pits at Pandharpur-Sangola, in the state of Maharashtra.
    Client: R.K. Chavan Infrastructure Pvt. Ltd.
  • Traffic sampling at three Toll Plaza locations (viz. Shahjanpur Toll Plaza, Mohanpur Toll plaza, Daulatpur Toll Plaza) along Manesar-Jaipur section on NH-8 in the state of Rajasthan. Traffic sampling included 7-day (24 hour) Manual classified volume counts complimented with 7-day (24-hour) video recording at all survey locations in year 2017.
    Client: Pink City Expressway Pvt. Ltd.
  • Carrying out all traffic surveys including CVC counts, OD surveys, Axle Load Surveys, Speed and delay Surveys, Material investigation surveys from Pits on subgrade soils, Borrow areas and quarry identification surveys, collection of soil samples from pits and borrows and aggregates from quarries, conducting all field testing on subgrade soils, conducting BBD and roughness testing for strengthening and widening of NH no. 183 near Adoor connecting Pathanamthitta, Vadserikkara, Lahai, and terminating at its junction with new NH No.: 183 near Vandiperiyar in the State of Kerala to two / four lane with paved shoulder configuration – Lot V (NH/IAHE/58) in year 2017.
    Client: STUP Consultants, Delhi.
  • Carrying out traffic surveys, axle load surveys, finding growth rates by transport elasticity method, analysis of all traffic and axle load survey and suggesting the axle load pattern for rigid pavement design, computing VDF and MSA for flexible pavement design for 71 km of EPC contract: Haridwar – Nagina section of NH-74 in year 2016.
    Client: Corsan Corvium Construction (I) Pvt. Ltd.
  • Soil and material investigations for EPC contract: Haridwar – Nagina section of NH-74 in year 2016.
    Client: Indian Geotechnical Services
  • Soil and material investigations for Detailed Project Report for Upgradation of Highway starting form junction with NH-40 at Kurnool connecting Nandikotkur, Atmakur and terminating at its junction with NH-765 at Dornala to Two / Four Lane with Paved Shoulder Configuration (Package No: NH/IAHE/30, Category-I) I year 2016.
    Client: MGM Engineers & Consultants Pvt. Ltd.
  • Carrying out material investigations, location of borrow areas, aggregate sources, and other construction material; laboratory testing of collected material from test pits, borrow area and crushers for Gujarat Border – Ahmadabad section of NH-8. in year 2016
    Client: SOMA Enterprise Ltd.
  • Carrying out traffic surveys including OD survey, axle load surveys, speed and delay survey, pedestrian count survey, Benkelman beam deflection survey, turning movement counts and roughness surveys, finding growth rates by transport elasticity method, analysis of surveys and suggesting the axle load pattern for rigid pavement design, computing VDF and MSA.
  • Overlay pavement design work, including carrying out Benkelman beam testing, for 60 m wide 9.4 km long road, in year 2009.
    Client: Meerut Development Authority
  • Traffic and Axle Load Survey on Haridwar site in the year 2018.
    Client: RCC Infra Ventures Ltd.
  • Traffic and axle load surveys for Rehabilitation and Up-gradation to two lanes with paved shoulders from Km 531/250 to Km 597/946 (Kunkuri to CG/JH Border Section) of NH-78 in the State of Chhattisgarh under NHDP-IV through Engineering, Procurement in the year 2017.
    Client: Shivalaya Construction Co. Pvt. Ltd.
  • Traffic sampling at three Toll Plaza locations (viz. Shahjanpur Toll Plaza, Mohanpur Toll plaza, Daulatpur Toll Plaza) along Manesar-Jaipur section on NH-8 in the state of Rajasthan. Traffic sampling included 7-day (24 hour) Manual classified volume counts complimented with 7-day (24-hour) video recording at all survey locations in year 2018.
    Client: Pink City Expressway Pvt. Ltd.
  • Geotechnical investigation for Mathura to Kasganj & Farrukhabad - Kalyanpur Station for Railway Electrifications work in the state of UP.
    Client: Matrixgeo, New Delhi
  • Standard Penetration Test Survey Farrukhabad-Kalyanpur Station for Railway Electrifications work in the state of UP.
    Client: Matrixgeo, New Delhi