Proof consultancy for construction of ROB at chainage 146.533 of NH-56 (New NH-731) along with its approaches and associated slip roads in the state of Uttar Pradesh on EPC mode
Client: NHAI
Proof consultancy for 6-laning with access control from km 29.435 to km 74.168 of Neelmangala - Tumkur including Tumkur bypass section of NH-48 (Old NH-4) in the State of Karnataka on EPC mode under Bharatmala Pariyojna
Client: PIU Chitradurga
Proof Consultancy for “Construction of LVUP at Km. 153+600 at Adhegaon junction and at Km.217+565 at Mohol junction on NH-65 and four-laning of Tembhurni town portion from old chainage km. 153+050 to km.159+280 (Not a part of NH-65) with design length 6.230 Km. in Pune Solapur section of NH-09 (new NH-65) in the State of Maharashtra on EPC mode. Appointment of Safety Consultant and Proof Consultant”
Client: NHAI, EPC Contractor: Goyala Infra Pvt. Ltd.
Detail design & Proof Consultancy for Widening of existing road to 2 lanes + P.S. standards of NH-158 Package-3
Client: MORTH
Construction of LVUP at Km. 153.600 at Adhegaon Junction & at Km. 217.565 at Mohol Junction on NH-65 & four-laning of Tembhumi town portion from old Ch. Km. 153.050 to Km. 159.280 (not a part of NH-65) with Design length: 6.230 Km in Pune Solapur section of NH-09 (New NH-65) in the state of Maharashtra on EPC mode
Client: PIU, Solapur, NHAI
© Copyright btes.in 2017. All Rights Reserved. | Design by